欧美在线免费观看一区二区三区-中文字幕第一页第二页第三-精品中文字幕高清久久久久三级-一区二区三区不卡视频在线观看

Language:CHINESESENGLISH

Home > News > Meishan Chun Xiao Bridge began the installation of steel
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:[email protected]
  • URL:http://m.bokepower.com

Meishan Chun Xiao Bridge began the installation of steel

Time:[2015-4-8]  Hits:5449

Meishan Chun Xiao Bridge began the installation of steel

      April 6, main pier triangle Ningbo Beilun 梅山春 dawn Bridge steel erection to caps arch seat, marking the bridge piers into the main steel structure installation phase. 梅山春 Xiao Meishan Bridge spans the waterway, a total length of 1.97 km, cost about 1.17 billion yuan, Bridge, all-welded construction, the lower vertical shift type bascule bridge across, expected to be completed by the end of 2016. After the completion of the bridge, the only bonded port area of Zhejiang Province where the Meishan Island, the coastal city of Ningbo as a whole.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號