欧美在线免费观看一区二区三区-中文字幕第一页第二页第三-精品中文字幕高清久久久久三级-一区二区三区不卡视频在线观看

Language:CHINESESENGLISH

Home > News > How to design the detailed drawings before the start of the steel structure project?
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:[email protected]
  • URL:http://m.bokepower.com

How to design the detailed drawings before the start of the steel structure project?

Time:[2019-2-23]  Hits:4243

The detailed drawing design of steel structure engineering is generally carried out by processing units. In order to meet this new requirement, a steel structure engineering should generally follow the following working order:
Factory Detailed Drawing Design Technical Design Unit Examination and Approval Detailed Drawing
Steel Structure Processing, Finished Product Transportation, Field Installation
Material Order Material Transportation Material Transportation
Detailed drawing design in the processing plant has the advantage of combining plant conditions and construction habits, easy to use advanced technology and high economic benefits. Detailed drawings shall be designed in accordance with the technical design drawings of the construction units and the specifications, standards and requirements specified in the contract documents. This requires the construction unit to have sufficient level of detailed drawing design ability.
In order to purchase (order) steel as soon as possible, steel should be ordered at the same time of detailed design. In this way, when the detailed drawings are approved, the steel can arrive and start production immediately.
Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號