欧美在线免费观看一区二区三区-中文字幕第一页第二页第三-精品中文字幕高清久久久久三级-一区二区三区不卡视频在线观看

Language:CHINESESENGLISH

Homepage > Product >
Contact Us
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:梁先生/Mr Leung
  • Phone:18900873383/18900873268
  • E-mail:[email protected]
  • Skype: sbs-Candy
  • URL:http://m.bokepower.com

Nigeria 4 storey office steel building

Nigeria 4 storey office steel building

Steel Structure 4 Floor Office In Nigeria

Steel Structure 4 Floor Office In Nigeria have special design.The whole frame use for the steel structure.The main frame use the H beam ,wall frame use the keel steel to do.About the floor use for the floor decking steel sheet ,included the stairs.The whole installation time just use the 2 months.

Steel beam and steel column connection

Steel%20structure%20four-storey%20office%20building%20in%20Nigeria-3.jpga

steel frame picture

IMG_1750.jpg


Wall installation

4500_10329_ed597d32-1909-463c-ae74-553270ac15da.jpg

overall graph

QQ圖片20160830085946_副本.jpg

Hits:12497 Time:[2024-11-23]

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)